Block to slab yield calculator
Estimate how many slabs a granite or marble block will give and how much saleable area that is, in m² per m³ and sq ft per CBM. Or enter a block you have already cut to measure its real recovery.
Estimate before cutting
Enter the block's net dimensions and your cutting setup.
The side the saw cuts through. Slabs come out length × height.
Stone lost to each blade or wire pass. Use your own machine's figure.
Rough edges cut off each side of the slab face.
- Slabs
- 58
- Saleable area
- 272.7m² (2,936 sq ft)
- Yield
- 36.9m²/m³
- Recovery
- 397sq ft/CBM
- Wastage
- 26.2%
- Net volume
- 7.40m³
Measure a block you have cut
Enter the block's net volume and the saleable slab area it produced.
- Yield
- 36.9m²/m³
- Recovery
- 397sq ft/CBM
- Saleable area
- 272.7m²
How the numbers are worked out
- Slabs per block
- Width to be sliced ÷ (slab thickness + kerf), rounded down, minus rejected slabs.
- Saleable area
- Slabs × (length − 2 × trim) × (height − 2 × trim).
- Yield
- Saleable area in m² ÷ net block volume in m³.
- sq ft per CBM
- Yield in m² per m³ × 10.7639, the number of square feet in a square metre.
- Wastage
- 1 − saleable area ÷ the area you would get with no kerf, trim or rejects.
The estimate is only as good as the inputs. Kerf, trim and rejects vary by machine, stone and block, so measure them in your own factory.
Run your stone business with data and AI
Manage procurement, production, inventory, and sales for your stone business, all in one platform.



