Know-NowKnow-NowKnow-NowKnow-Now

Block to slab yield calculator

Estimate how many slabs a granite or marble block will give and how much saleable area that is, in m² per m³ and sq ft per CBM. Or enter a block you have already cut to measure its real recovery.

Estimate before cutting

Enter the block's net dimensions and your cutting setup.

The side the saw cuts through. Slabs come out length × height.

Stone lost to each blade or wire pass. Use your own machine's figure.

Rough edges cut off each side of the slab face.

Slabs
58
Saleable area
272.7m² (2,936 sq ft)
Yield
36.9m²/m³
Recovery
397sq ft/CBM
Wastage
26.2%
Net volume
7.40m³

Measure a block you have cut

Enter the block's net volume and the saleable slab area it produced.

Yield
36.9m²/m³
Recovery
397sq ft/CBM
Saleable area
272.7m²

How the numbers are worked out

Slabs per block
Width to be sliced ÷ (slab thickness + kerf), rounded down, minus rejected slabs.
Saleable area
Slabs × (length − 2 × trim) × (height − 2 × trim).
Yield
Saleable area in m² ÷ net block volume in m³.
sq ft per CBM
Yield in m² per m³ × 10.7639, the number of square feet in a square metre.
Wastage
1 − saleable area ÷ the area you would get with no kerf, trim or rejects.

The estimate is only as good as the inputs. Kerf, trim and rejects vary by machine, stone and block, so measure them in your own factory.

Run your stone business with data and AI

Manage procurement, production, inventory, and sales for your stone business, all in one platform.